Quick answer
Permits is the core object here; understand the problem it solves before choosing a tool or workflow. Electrical/install/backup may need permits.
Why it matters
Without the concept, format, permission or compatibility issues are easily misread as tool failures.
Electrical.
Step by step
- Check backup needs/solar/rates/rebates/electrical.
- Separate battery/inverter/install/electrical/permits.
- Check rebates/tax credits/financing.
- Get 2-3 quotes; confirm capacity/warranty/backup.
Common mistakes
- Battery price only, not inverter/install.
- Ignoring backup/electrical/permits.
- Not checking rebates/rates.
- No capacity/warranty terms.
Checklist
- Backup/solar/rates/electrical.
- Battery/inverter/install/permits.
- Rebates/credits/financing.
- Capacity/warranty/payment.
- Budget/ROI/maintenance.
Key facts
- Electrical.
- Install.
- Inspection.
FAQ
What is Permits?
Permits is the core object here; understand the problem it solves before choosing a tool or workflow. Electrical/install/backup may need permits.
How long does it take?
Usually 1-3 minutes; for intermittent issues, run 30 seconds and retest elsewhere.
Is data uploaded?
Runs locally and does not upload video/audio; extensions may still read the page.
Source: EnergyStar